Not.  Having.  A good.  Day.  At all.
The stupid, messy, why-the-fuck-am-I-stuck-with-this-crap, piece of shit job goes out next Tuesday.  Today, I discovered that structural’s plans and our plans don’t line up.  We have the finished floor elevation 1 inch higher than what structural is showing. 
The worst part is: structural is right, and I look like an idiot.  I don’t even know why I didn’t check these things before now.  Fucktard.  I never should have relied upon the drawings that I first received to be correct.
The Stress-o-Meter is on the way up.  I’m going to explode; I can feel it.
Also, somebody has been stealing my goddamn creamer.  (I know I stole from somebody else’s creamer once, but I paid for it by catching a nasty little viral infection.  I have learned my lesson.)  It wouldn’t be so bad, and I probably wouldn’t have noticed, if they didn’t make a mess when pouring it and leave schmootz all over the lid when they do it.  I put a helpful little note on the bottle that reads, “If you are using this creamer, be warned!  I lick the bottle!!” 
That ought to put a stop to it.
Dammit, I want to telecommute.
 
4 comments:
Dude, I'm sor sorry. How long is it going to take to fix your elevations?
Ah, I finished the plans by the end of the day yesterday. It won't take long to fix the elevations- it's just a matter of changing two drawings.
Well, I'm glad it isn't going to be too evil.
Loved Office Space. I totally have the stapler guy at my work.
Post a Comment